A Few Past/Current Projects

  • Murra Warra Wind Farm Stage 1 – Construct access tracks, supply water trucks, labor and admin including rehabilitation works following the commencement of Stage 2.
  • GrainCorp Inc – Bunker maintenance of all sites across Victoria & Southern New South Wales
  • Moorabool Wind Farm – Construct access tracks and supply water truck.
  • Pakenham Train Depot – Strip material from site and construct pad for new train depot at Pakenham
  • West Wimmera Shire Council – Flood recovery works of local roads within the shire
  • West Wimmera Shire Council – Reconstruction of portion of Edenhope Goroke Road including culvert installation and completed to a standard ready for sealing.
  • Southern Grampians shire – Landfill
  • Iluka Douglas mineral sand mine – Rehabilitation of overburden at the Iluka Douglas site moving approximately 1.25 million m³.
  • Iluka Douglas & Echo mineral sand mine – Stripping of topsoil and subsoil of both sites with 5 million m³ to move along with other dayworks as requested.
  • Waubra Wind Farm – Subcontracted to construct hard stands
  • Horsham Landfill – Capping of Horsham (Dooen) landfill
  • SeaGas – Maintenance of signage and remediation earthworks along the gas pipeline from Port Campbell, Victoria to Gawler, South Australia
  • P F Olsen – Construct access tracks for harvesting of bluegums and other maintenance works on various bluegum blocks in Southwestern Vic and Southeastern SA.
  • Various farming enterprises – Waterhole construction, drainage, clay spreading, shed site preparation and any other earthworks that are